Special Character

  • Riverbend Bible Church

    Brief

    To provide geotechnical, structural, civil and fire engineering design as part of a design team from feasibility and concept through to construction completion.

    Project Outline

    This architecturally designed upgrade of the existing multi-use building, incorporated a new ablutions block and enclosed walkway linking the two facilities. The project included stormwater design, new foundations, steel frames, masonry and timber walls, as well as demolition and strengthening of existing brick walls.

    Challenges

    The geotechnical report indicated the site had geotechnical challenges which required upgraded foundation solutions including foundation ties and rafting.

    We were required to create a structural design that met the client’s criteria, while  minimally disrupting the interior of the multi-use building. This was achieved by applying strengthening to the exterior using buttressing structures for strengthening and structural framing of additional walkways and utility rooms.

    We also had to design on-site stormwater disposal solutions.

     

  • Maryknoll Chapel

    Brief

    To provide geotechnical, structural and fire engineering design from feasibility and concept through to the completion of construction.

    Project Outline

    The project involved an upgrade of the existing monastery accommodation block and construction of a new chapel. The development also included the upgrade of the accessway.

    Challenges

    The new chapel was a challenging structure, utilising curved glue-laminated timber rafters to form a dome on a sloping site.

  • Karamu High School Sculpture

    Brief

    To provide structural design from feasibility and concept through to the completion of construction.

    Project Outline

    The project involved foundation and super-structure design of a complex steel sculpture.

    Challenges

    The complexity of the structure required a combination of design modelling and on-site verification during fabrication.

    Outcome

    This work resulted in an aesthetically pleasing sculpture and a very satisfied client.

  • Hastings Courthouse Sculpture

    Brief

    To provide structural design from feasibility and concept through to completion of construction.

    Project Outline

    The project involved foundation and super-structure design of a complex steel sculpture.

    Challenges

    The complexity of the structure required a combination of design modelling and on-site verification during fabrication.

  • Greenmeadows New World Sculpture

    Brief

    To provide a structural design from feasibility and concept through to the completion of construction.

    Project Outline

    To design a metallic tree sculpture to be placed in the Greenmeadows New World carpark. The structure was 6m high and each leaf was different.

    Challenges

    Due to the unique structural form of the sculpture, the design was based on a series of prototypes which were fabricated and tested before finalising the design.

    Outcome

    The project was completed on time and on budget and is now an iconic feature of the supermarket.

Commercial

David Trubridge Design Building

TRU3321

Brief

To design and project manage through to completion a functional and economical large format workshop facility with front office and reception area, based on a scheme by architects.

Project Outline

This large project consisted of a 1,050m² workshop and main office/reception area with a 350m² mezzanine floor housing extra offices. Currently, the building is undergoing an extension of the mezzanine to incorporate a photography room and an executive meeting area.

Challenges

It was a large building, with a tight budget and timeframe, incorporating a light framework with a specific engineering design in order to use minimal amounts of steel.

Client Comment

“I have used Strata Group for all of my engineering matters for six years so far. I return to this company because I know the level of service I receive is first class and also because the company has the in-house ability to tackle most projects. I rely heavily on their skill-set and wish to continue the working relationship into the future.” James Lee, General Manager Property, Scales Corporation Ltd